EAC takes very seriously its responsibility for sound, proper, accurate, verifiable, and defensible monitoring and evaluation. The ultimate function for M&E is to adequately reflect the results of project interventions and demonstrate quality in programme operations and project implementation. The entire EAC programme is invested in and actively participates in advantaging millions of children with an education they might otherwise not have experienced.
Annex A: EAC M&E Plan
- Monitoring and Evaluation Plan (2013, PDF - 1.42 MB)
Annex B: Recent KPI Report
- Key Performance Indicators - Decemeber 2016 (PDF - 548.61 KB)
Annex C: Guidelines for M&E System
- Guidelines: Monitoring and Evaluation System (Demember 2016, PDF - 218.65 KB)
Annex D: EAC Semi-annual Report Guidelines
- EAC Semi-annual M&E Online System User’s Manual (January 2017, PDF - 2.74 MB)
- EAC Semi-annual Financial Report Template (January 2017, XLS - 121.23 KB)
- EAC Semi-annual Technical Report Guidelines (January 2017, PDF - 475 KB)
Annex E: EAC Site Monitoring Guide
- EAC Site Monitoring Guide (June 2014, PDF - 2.42 MB)